1972 Montego GT 429 Updates - September 2013

Please Note:  Hours for Thursday May 25 are 7:00 until 11:00AM


1972 Montego GT 429 Monthly Updates

  • Car has been completed for just over a year now - approx 1600 miles
  • If you've been looking for the nicest and one of the rarest Montegos, this is the one - full resto all documented 1 of 202 that came with a 429 (confirmed with the Marti-Report).
  • The original 429 block was used, the original transmission and the original rear end.
  • 1 of 1 if you include all the options that came with this car.  (confirmed with the Marti-Report)
  • FOR SALE - $39,900 Serious ONLY - Contact me

All the links below include pics and info that shows work that was done during that particular month

9-2-2015 Article written by Chuck Green - Featured on the StreetLegalTV Online Magazine website.
Scott Farrell's 72 Mercury Montego GT "Forgotten American Muscle"

Before Images 
(added 11/9/13)

July 2013 Updates | August Updates | September Updates | October Updates | November Updates
December Updates | January 2014 Updates | February | March  | April | May | June | July | August 
| September | October | November | December
January 2015 / 2015-2016

  My Car/Truck Videos | New parts boughtSeat material wanted

Cam specs - custom grind (spec by Randy 460 forum - grind by Lunati 
272/282@.006" - 225/233@.050" - 136/143@.200" - .320"/.312" lobe lift, (.576"/.562" with 1.8/1 ratio rocker arms), 109 separation; 107 intake centerline.

Have a comment you'd like to post concerning the 72 Montego GT build? Be sure to register to post

My 1973 Montego MX (see monthly updates toward the top once you get to the page)
My 1966 Chevy C-10  (see monthly updates toward the top once you get to the page)

1972 Montego GT 429 Updates - September

Went on vacation the first week of September
Came back to a lot of parts
Got the frame sandblasted
Bushings installed
frame painted 9-14
First part installed (steering box) - 9-16
installed steering linkage upper a-arms
installed brake and fuel lines


Went on a trip to Myrtle Beach and came back to quite a few new parts that were delivered when we were gone
Rotors - arm rests- calipers- poly bushing kit - brake lines - headliner - window crank handles


Susp parts are back from getting sandblasted


September 5 - Removal of the riveted in ball joints

Frame should be back next week.

Ordered my brake and fuel lines - stainless steel


9-5


Got some parts in primer


9-10
Suspension parts primed. These were sandblasted first. I then opted to have the energy suspension poyurethane
bushings installed first before priming and painting

9-12
Got the frame back from the sandblaster.
Came out very good!

9-14 Went in and sealed and painted the frame semi-gloss black


Frame in black sealer


semi-gloss black

My first part is on! New quick ratio power steering box - 9- 16


9-28 Control arms along with other parts. All ball joints and tie rod ends are Moogs.


Installed the upper control arms


9- 29 Started putting on the control arms, the steering linkage and the brake lines


Sunday -9-29-2013 My niece wanted to help. So I had her disassemble the Ford 9"